For tenants

Capacity delivered for you.

DC01SK is a permitted development site with a staged power path. It can host your capacity, delivered build-to-suit: you commit, we build. The route to capacity here starts from a permitted baseline instead of a land search.

Build-to-suit concept visualisation (indicative)

What is in place today

42,000 m² of permitted halls 10 m clear internal height, fixed documented envelope
~3 MW construction-ready today staged path toward ~200 MW worked with the regional grid operator
6 carriers on record as able to serve the site
80%+ low-carbon grid
One owner, one title

How build-to-suit works

  1. 1

    Bring your requirement.

    Capacity, timeline, specification.

  2. 2

    We shape the delivery plan.

    Staged power, permitted envelope, build programme.

  3. 3

    You commit, we build.

    The first power uplift is targeted within about ten months of a commitment.

The existing permits cover warehouse and logistics buildings with a documented envelope; the delivery path for data center use is developed with the counterparty as part of the build-to-suit plan.

Looking at the site as an acquisition instead? See For buyers.

Frequently asked questions

Can a data center be built under the existing permits?

The permits in force cover warehouse and logistics buildings with a fixed, documented envelope: 42,000 m² of permitted halls at 10 m clear internal height. Those consents are not presented as a data center permit; the delivery path for data center use is developed with the counterparty as part of the build-to-suit plan, and the status of each element is stated as built, permitted or planned. The permit chain, with its extensions documented, is set out on For buyers.

What power is available today, and on what schedule does more arrive?

On-site power today is ~3 MW construction-ready, enough for site works and not for a campus. The route to more is a staged pathway toward ~200 MW in active engagement with ZSD, the regional distribution operator: a first uplift targeted within about ten months of a commitment, with further phases over roughly twenty-four months. None of that is presented as contracted power, and the infrastructure behind it is set out on The grid next door.

What happens after we request more info?

You bring the requirement: capacity, timeline, specification. We shape the delivery plan around it, covering staged power, the permitted envelope and the build programme, and the build starts when you commit, with the first power uplift targeted within about ten months of that commitment. Material beyond these pages, including the design documentation, geotechnical survey and groundwater chemistry analyses, is available to qualified counterparties; the route in is Request more info or info@dc01sk.com.

Get in touch

Request more info.

We use your details only to respond to your request. Privacy policy

or email info@dc01sk.com